COGNOS 8 POWERPLAY TRANSFORMER WORKSHOP
Document content prepared by Viswas Cheppuri
Working with Existing Project:
Ø Open the Frame work Project “gosales_goretailers.cpf” from the directory “C:\Program Files\Cognos\FM\c8\webcontent\samples\Models” from your PC
Ø Save the project into some other location in the PC as we are going to modify the same.
Ø Try to test any of the query subject and if it gives error then change the Data Source Properties for the project
For the Data Source: gosales

And for the Data Source: goretailers
Set the Schema Name as GORT
Ø Now test the query subject it will give data.
Specification for the Sample Cube:
Cube Name: Revenue Cube
Dimensions
S.No Dimension Name Levels Source Field Source Table Remark 1 Time Year ORDER_DATE ORDER_DETAILS Quarter ORDER_DATE ORDER_DETAILS Month ORDER_DATE ORDER_DETAILS Day ORDER_DATE ORDER_DETAILS Current Month Previous Month Last 12 Months 2 Products Product Line PRODCT_LUNE_EN PRODCT_LUNE Product Type PRODUCT_TYPE_EN PRODUCT_TYPE Product PRODUCT_NAME_EN PRODUCT_MULTILINGUAL 3 Order Method Order Method ORDER_METHOD_EN ORDER_METHOD 4 Location SALES_TERRITORY_EN SALES_TERRITORY Country COUNTRY SALES_BRANCH Region REGION SALES_BRANCH City CITY SALES_BRANCH 5 Sales Staff Resp FIRST_NAME, LAST_NAME SALES_STAFF 6 Retailer Retailer Type RETAILER_TYPE RETAILER_TYPE Retailer Name COMPANY_NAME COMPANY_ANME
Measures
S.No | Measure Name | Source Filed | Source Table | Remark |
1 | Quantity | QUANTITY | Order_details | |
2 | Gross Profit | Order_details | ((QUANTITY * UNIT_SALE_PRICE) - (QUANTITY * UNIT_COST)) | |
3 | Revenue | Order_details | (QUANTITY * UNIT_SALE_PRICE) | |
4 | Planned Revenue | Order_details | (QUANTITY * UNIT_PRICE) |
Preparing Data Source File (IQD) from Framework Manager
Case 1: With Single IQD:
Ø From the Framework Manager Create a Name Space called “Data Source Files” under “gosales_goretailers” Namespace
Ø Under the new namespace Create a folder called Revenue Cube so that all the data sources of this cube can be placed under this folder.
Ø Under this folder create a Model Query Subject namely “Revenue_Cube_Source”
Ø Drag all the required files from the Source into this Query Subject.

Ø From the properties pane set the Externalized Method property of the Query Subject as ‘iqd’
Ø

Ø Now verify the same location we can see the IQD file.

Preparing Model:

Ø Go for the New model
Ø Set the data source type as Impromptu Query Definition
Ø Set the path of the IQD file
Ø Un select Run Auto Design Button

Ø And Click OK.
Ø If it gives an error bcz there is no entry in the Cognos.ini file for this data source

Ø Search for the Cognos.ini file in the local system
Ø And make an entry for this data source

Ø And Click Ok, so that the IQD file can be accessed into the model.

Ø Create the Time Dimension by using Date Wizard with the levels of Year, Quarter, Month and Day
Ø Prepare the dimensional model by inserting all the dimensions and Measures

Ø Do the Calculations for the remaing measures



Ø Insert a Power Cube


Ø Generate the Categories

Go to the Diagram and Look at the category Viewer

Remove all the categories not needed
Calculate the current Month in the Category Diagram



Last 12 Months

Now Built the Power Cube.




No comments:
Post a Comment